• About us
  • Advertise
  • Privacy & Policy
  • Contact
Wednesday, May 6, 2026
  • Login
NewsPeg Magazine logo
  • Home
  • News
    • World
    • Business
    • Politics
  • Technology
  • Entertainment
    • Sports
  • Lifestyle
    • Health
No Result
View All Result
  • Home
  • News
    • World
    • Business
    • Politics
  • Technology
  • Entertainment
    • Sports
  • Lifestyle
    • Health
No Result
View All Result
NewsPeg Magazine logo
No Result
View All Result
Home News

Umahi Flags Off New Carter Bridge Project, Orders Partial Closure Of Eko Bridge Over Structural Threat

newspegonline24 by newspegonline24
May 6, 2026
in News
Reading Time: 4 mins read
0
Umahi Flags Off New Carter Bridge Project, Orders Partial Closure Of Eko Bridge Over Structural Threat
Share on FacebookShare on TwitterShare on Whatsapp

By Nkechi Eze

The Federal Government has officially handed over the construction of a new Carter Bridge in Lagos to China Civil Engineering Construction Corporation (CCECC), as part of efforts to safeguard critical infrastructure and ensure public safety.

The handover ceremony, which took place at Carter Bridge, Lagos Island, on Wednesday, May 6, 2026, signals the commencement of a major infrastructure renewal initiative under the administration of President Bola Ahmed Tinubu.

In an official signed statement by the Senior Special Assistant to the Honourable Minister of Works on Media, Mr. Francis Nwaze, the Honourable Minister of Works, Senator Engr. David Umahi, CON, said the decision to reconstruct the bridge followed alarming structural findings from years of technical investigations.

Speaking at the event, Senator Umahi revealed that initial underwater assessments conducted in 2013 and later in 2019 exposed serious and worsening defects in both Carter Bridge and the 3rd Mainland Bridge.

“The past administration commissioned investigation of what was happening with the structural elements below the water, and that was in 2013. And the very disturbing defects were noticed in Carter Bridge and 3rd Mainland Bridge,” he said.

He explained that upon assumption of office, the present administration engaged geologists and specialist divers to conduct further underwater evaluations, which confirmed that some of the piles supporting the bridges had shifted from their caps, posing significant structural risks.

“It’s just like the hip of the leg is cut off,” the Minister said while illustrating the severity of the damage.

Following consultations with local and international bridge experts, stakeholders, and members of the National Assembly, Umahi stated that technical recommendations showed that repairing the Carter Bridge would cost nearly twice the amount required to construct a new one.

He added that the Federal Government subsequently approved the construction of a modern bridge, part of which will feature a cable-stayed design to enhance navigation and aesthetics.

“We decided that a section of this Carter Bridge will be a cable bridge. You see the cable bridge we see overseas, very beautiful, and that is to enhance our navigational activities,” he said.

The Minister disclosed that the project, valued at N545 billion, is expected to be completed within 36 months and will be funded through a financing structure comprising 30 percent Federal Government contribution and 70 percent external borrowing.

He further noted that due process was strictly followed in the selection of the contractor, with seven firms invited and six submitting bids.

“The CCECC was technically and commercially most viable. And that’s why the Bureau of Public Procurement recommended them and the Federal Executive Council approved the project,” Umahi stated.

Formally handing over the site, the Minister directed CCECC to immediately mobilize while assuring that the Ministry would conduct monthly monitoring to ensure strict adherence to engineering and safety standards.

Meanwhile, Senator Umahi announced an emergency partial closure of the Eko Bridge following severe structural damage linked to illegal dredging activities.

He disclosed that sand miners struck a pile cap with a barge, leading to the destruction of five supporting piles and causing visible cracks and instability on a section of the bridge.

“When they knocked the pile cap, they broke three piles. And when they were trying to remove the barge, they broke another two,” he said.

As a precautionary measure, the Minister directed that one carriageway of the Eko Bridge be shut down by midnight of Sunday, May 10, 2026, while traffic will continue on the unaffected section.

“We will not allow people to endanger their lives. We are a responsible administration,” he stated.

He disclosed that an emergency engineering intervention has been designed, involving the lifting of an entire bridge span to allow access for repairs, with Buildwell Construction assigned to execute the operation alongside underwater assessments by specialist divers.

The Minister assured that President Bola Ahmed Tinubu has been fully briefed and directed that the situation be treated with urgency.

“President said I must be in Lagos to examine it and then treat it as an emergency situation. And that is what we are doing,” Umahi said.

He appealed to Lagos residents for patience, assuring that the Federal Government remains committed to protecting lives and preserving critical infrastructure across the country.

“We are solving problems we didn’t create, but that’s why you voted for us, and that we are going to be working day and night,” he added.

ShareTweetSend
Previous Post

Nigerian Navy Intercepts Smuggled Rice, Transfers 125 Bags To Customs In Lagos

newspegonline24

newspegonline24

Related Posts

Nigerian Navy Intercepts Smuggled Rice, Transfers 125 Bags To Customs In Lagos
News

Nigerian Navy Intercepts Smuggled Rice, Transfers 125 Bags To Customs In Lagos

May 6, 2026
Police Record Sweeping April Operations, Arrest Terrorists, Kidnappers, Recover Arms Nationwide
News

Police Record Sweeping April Operations, Arrest Terrorists, Kidnappers, Recover Arms Nationwide

May 6, 2026
El-Rufai, Associate Face 10-Count Money Laundering Charges Over Alleged Multi-Million Naira and Dollar Transactions
News

Court Adjourns El-Rufai Bail Variation Ruling, Orders Supervised Medical Access

May 6, 2026

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Editor's Choice

Umahi Flags Off New Carter Bridge Project, Orders Partial Closure Of Eko Bridge Over Structural Threat

Umahi Flags Off New Carter Bridge Project, Orders Partial Closure Of Eko Bridge Over Structural Threat

May 6, 2026
Nigerian Navy Intercepts Smuggled Rice, Transfers 125 Bags To Customs In Lagos

Nigerian Navy Intercepts Smuggled Rice, Transfers 125 Bags To Customs In Lagos

May 6, 2026
  • Trending
  • Comments
  • Latest
Imo Monarch Raises Alarm as 22-Year-Old Abandoned Road Threatens to Cut Off Okwuohia Community

Imo Monarch Raises Alarm as 22-Year-Old Abandoned Road Threatens to Cut Off Okwuohia Community

August 26, 2025
NIMC Trains Corps Members for Nationwide NIN Ward Enrollment Initiative

NIMC Trains Corps Members for Nationwide NIN Ward Enrollment Initiative

June 24, 2025
FG Rescues 11 Nigerian Miners Stranded in Central African Republic, Brings Them Home Safely

FG Rescues 11 Nigerian Miners Stranded in Central African Republic, Brings Them Home Safely

August 15, 2025
Estate dispute: Son sues Senator Zainab Kure over late Governor Abdulkadir Kure’s Asokoro residence, bank accounts

Estate dispute: Son sues Senator Zainab Kure over late Governor Abdulkadir Kure’s Asokoro residence, bank accounts

April 8, 2026

MEDIA FOUNDATION SEEKS UPGRADED DIGITAL INFRASTRUCTURE IN NIGERIA

4
Maiduguri Beyond the Smoke: Secured By Sacrifice, Reclaimed by Hope

Maiduguri Beyond the Smoke: Secured By Sacrifice, Reclaimed by Hope

3

Easter/Eid-el-Fitr: FRSC Records Massive Reduction in Road Crashes.

2
GSAI TRAINS JOURNALISTS TO INTENSIFY ENGAGEMENTS REVOLVING AROUND INVOLVEMENT OF WOMEN IN POLITICS AND GOVERNANCE

GSAI TRAINS JOURNALISTS TO INTENSIFY ENGAGEMENTS REVOLVING AROUND INVOLVEMENT OF WOMEN IN POLITICS AND GOVERNANCE

2
Umahi Flags Off New Carter Bridge Project, Orders Partial Closure Of Eko Bridge Over Structural Threat

Umahi Flags Off New Carter Bridge Project, Orders Partial Closure Of Eko Bridge Over Structural Threat

May 6, 2026
Nigerian Navy Intercepts Smuggled Rice, Transfers 125 Bags To Customs In Lagos

Nigerian Navy Intercepts Smuggled Rice, Transfers 125 Bags To Customs In Lagos

May 6, 2026
Police Record Sweeping April Operations, Arrest Terrorists, Kidnappers, Recover Arms Nationwide

Police Record Sweeping April Operations, Arrest Terrorists, Kidnappers, Recover Arms Nationwide

May 6, 2026
El-Rufai, Associate Face 10-Count Money Laundering Charges Over Alleged Multi-Million Naira and Dollar Transactions

Court Adjourns El-Rufai Bail Variation Ruling, Orders Supervised Medical Access

May 6, 2026
NewsPeg Magazine

Newspeg is a General interest Magazine conceived by Nigerian Media practitioners of like minds across ethnic and geo-political divides of the country, for the purpose of creating uniqueness in Magazine reporting in Nigeria and repositioning the country for the needed growth.

Follow Us

  • About us
  • Advertise
  • Privacy & Policy
  • Contact

© 2026 Newspeg magazine - powered by Xtended.

No Result
View All Result
  • Home
  • News
    • Business
    • World
  • Technology
  • Entertainment
  • Lifestyle
  • Editorial
  • Columns
  • More

© 2026 Newspeg magazine - powered by Xtended.

Welcome Back!

Login to your account below

Forgotten Password?

Retrieve your password

Please enter your username or email address to reset your password.

Log In